Marine Corps Base Camp Pendleton, Sewage Effluent Compliance Project, Las Pulgas and San Mateo Areas

Marine Corps Base Camp Pendleton, Sewage Effluent Compliance Project, Las Pulgas and San Mateo Areas

4.11 - 1251 ratings - Source



The purpose of the equalization basins is to equalize the flow of secondary efiluent to a 0.7 mgd direct filtration AWT plant. Facilities of the plant will be sited to the west of the existing STP 9 trickling filter and will consist of two alum rapid mix pumps (one duty and one standby), a three-stage flocculation basin, two dual media filters (one duty and one standby), rapid mix pumps, and a chlorine contact tank. The Manual of Practice No. 8 (Water Environment Federation) and ASCE Manualanbsp;...


Title:Marine Corps Base Camp Pendleton, Sewage Effluent Compliance Project, Las Pulgas and San Mateo Areas
Author:
Publisher: - 1997
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA